Building and Repair Disputes: The Law Explained

By Tradesmen Dispute Direct · Updated 3 November 2026 · General information for England and Wales

Understand the law behind unpaid invoices, extra work and disputed repairs. Each topic explains the rule, shows how it works and identifies useful evidence. You do not need legal training. This guide covers England and Wales.

More topics: Consumer rights · Agency and authority · Contractors and subcontractors · Late payment · Negligence · Building safety · Case law

Court notices: Directions Questionnaire · Mediation · Court directions · Quick questions

The Court System

Which court handles a money dispute, what small claims means, and why most trades disputes stay in the County Court.

Contract Law

How agreements are made, what work and price were agreed, and what happens when someone breaks a promise.

Before Court

Work out who owes the money, check the time limit, collect evidence and write to the other side before starting a claim.

Evidence & Proof

What you need to prove, and how quotes, messages, photos, payment records and witnesses can help.

Running a Small Claim

Starting or answering a claim, trying mediation, preparing evidence, attending the hearing and collecting money after a decision.

Trades Dispute Examples

Fictional examples about unpaid bills, extra work, faulty repairs, delayed jobs and money held back from payment.

The Court System

What Is the Small Claims Court in England and Wales?

The County Court deals with most everyday disputes about unpaid invoices and faulty building work. People often call part of this process the small claims court. There is no separate court with that name.

The claimant starts the court claim. The defendant answers it. A civil case concerns money or legal rights. It is different from a criminal prosecution.

If the claim is disputed, the court chooses a track. This means the set of rules used to manage the case. The small claims track is usually the simplest route for a straightforward money dispute.

Orange illustration of a County Court building

How the Courts Fit Together

Start with the County Court and small claims explanations below. The other courts deal with larger or specialist cases and some appeals. An appeal asks a court to review an earlier decision. Your case does not automatically pass through every court.

WHERE MOST TRADES CLAIMS BEGIN

County Court

An electrician may ask the County Court to order payment of an unpaid £2,500 bill. A homeowner may ask it to award £3,000 for faulty repairs. In either case, the person making the claim must explain the agreement or legal duty, what went wrong and how the amount was calculated.

Small Claims Track

The small claims track is a simpler court process for many straightforward claims worth £10,000 or less. The limit is different for some injury and housing claims. The court also considers the type and complexity of the case.

You can usually present your own case without a solicitor. The hearing is less formal than a larger trial, but you must still follow court instructions and deadlines.

Court fees may be payable. There are limits on the legal costs the losing side can be ordered to pay, but small claims are not always free of costs.

Read the official small claims rules

OTHER CIVIL COURTS — SELECT A COURT FOR MORE DETAIL

The High Court handles larger, more complex or specialist civil cases. Its Technology and Construction Court deals with some complex building and engineering disputes.

Why it matters: An ordinary unpaid repair bill will normally belong in the County Court. The correct court depends on the type, value and complexity of the dispute.

Official High Court information

The Court of Appeal reviews certain decisions made by lower courts. An appeal usually concerns an important error in the earlier decision. It is not simply another chance to repeat the same arguments.

Why it matters: Permission to appeal is normally needed. The appeal route depends on the judge and decision involved. A small claims decision does not automatically go straight to the Court of Appeal.

Civil court structure

The UK Supreme Court is the final appeal court for civil cases across the United Kingdom. It hears a small number of cases raising important legal questions.

Why it matters: Permission to appeal is required. Most trades disputes will never reach this court. Its decisions can still explain legal rules that lower courts must use when those rules apply.

About the Supreme Court

Small Claims Court: Common Questions for Tradespeople

Can a tradesperson claim an unpaid bill? Yes, where there is a legal right to payment. Identify the customer who agreed to pay, explain why payment is due and show the calculation.

Can a homeowner claim for faulty work? Yes, where the work breaks the agreement or a legal duty and the remedy claimed is available. A remedy is the result the law allows, such as compensation or correcting the work.

Do I need a solicitor? You can usually represent yourself. Read the court papers carefully. Winning a judgment—the court’s decision—does not mean the court will automatically collect the money.

Before Court · Evidence & Proof · Running a Small Claim

HOMEOWNERS AND CONSUMER LAW

Consumer Rights When Hiring a Tradesperson

Consumer law gives a private customer rights about workmanship, prices, promises, cancellation and faulty goods. These rights can apply even when the quotation does not mention them.

Start by checking who bought the work and why. Then use the topics below to understand the particular problem. A right to cancel after changing your mind is different from a right to complain about defective work.

CONSUMER LAW 01

Is the customer a consumer or a business?

A consumer is an individual buying mainly for private purposes. A trader supplies the work as part of a trade or business.

The customer’s purpose matters more than the building’s appearance. Work in a house is not always a consumer job. An individual landlord ordering repairs for a rental business may be acting in a business capacity. A limited company cannot be a consumer under these rules.

FICTIONAL TRADES EXAMPLE

Fictional example: Alex hires a decorator for the house where Alex lives. This is normally a consumer service. A property company hires the same decorator to prepare a rental house. The company is a business customer, even though the work looks identical.

Why it matters: identify the actual customer and purpose before applying consumer cancellation or service-remedy rules.

CONSUMER LAW 02

Cancelling a contract made at home or at a distance

Some consumer service contracts have a 14-day cooling-off period. This usually applies to contracts agreed away from the trader’s premises, such as at the customer’s home. It can also apply to contracts made entirely through an organised distance-sales system, such as online. Not every telephone call or home visit creates the same rights.

The trader must also explain that a customer who requests an early start may have to pay for the part supplied if they then cancel.

For a service contract, the normal period ends 14 days after the day the contract was made. The trader must give the required information about cancellation. Missing that information can extend the period, potentially by 12 months beyond its normal end.

Starting early does not automatically remove the right to cancel. The customer must expressly request an early start. For a contract made away from the trader’s premises, keep that request in a lasting form, such as an email.

If the customer cancels before completion, payment may be due for the part of the service already supplied. This is called proportionate payment. Missing the required information or early-start request can prevent charging for services supplied during the cancellation period. The right can end after full completion, but the customer must have requested the early start. Before work began, they must also have acknowledged that full completion would end the right.

There are exceptions. For example, a visit specifically requested for urgent repairs can be exempt for that urgent work. Additional non-urgent work can still have cancellation rights.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner agrees at home to pay £1,200 for decorating labour. The homeowner supplies the paint. The decorator gives the required information about cancellation and payment for an early start, and the homeowner emails a request to start immediately. The homeowner cancels six days later, before completion.

Why it matters: assuming the normal cancellation rules apply, the early start alone does not remove the right to cancel. The decorator may claim a proportionate amount for the service already supplied under the rules. That is different from automatically charging all £1,200. Without the required information or early-start request, entitlement to that payment can change.

CONSUMER LAW 03

The standard of work the law expects

A trader must do a consumer’s work with reasonable care and skill. This means the standard reasonably expected of a competent person doing that kind of job. Section 49 of the Consumer Rights Act 2015 puts this requirement into the contract.

The customer does not need to show deliberate wrongdoing. But being unhappy with the result does not, by itself, prove poor workmanship. Identify the actual defect and the evidence that the work fell below the required standard.

FICTIONAL TRADES EXAMPLE

Fictional example: A shower leaks. Inspection evidence shows the installer used waterproofing unsuitable for that shower. This can support a claim that the installer failed to use reasonable care and skill. If the leak instead came from an unrelated pipe damaged later, the same complaint would need a different explanation.

Keep: the product details, photographs and evidence of the leak’s cause.

CONSUMER LAW 04

What was promised about the work and materials?

What a trader says about a service can become part of a consumer contract. Under section 50, the customer’s decision matters: did they take that information into account when choosing the service or making a later decision about it?

A promise about a named product, standard or service is not automatically lost because the final paperwork is short. Any qualifications to the promise and any change expressly agreed later also matter. Keep advertisements, quotations and messages showing what was promised.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner chooses a roofer partly because the quote promises a named waterproof membrane. The roofer installs another brand without agreement.

Why it matters: the issue is whether the promised product became part of the contract. The roofer cannot settle that question simply by saying the substitute was just as good. A later express agreement to the substitution could change the answer.

CONSUMER LAW 05

Price, timing and completion

If a consumer contract has no agreed price, or method for working it out, section 51 normally requires a reasonable price. If no completion time is fixed, section 52 requires completion within a reasonable time.

These are fallback rules. They do not let someone replace a price or date that was already agreed. What is reasonable depends on the work and circumstances, such as its size, normal costs and any genuine urgency.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner asks a plumber to stop a leak without agreeing a price. The plumber must be able to explain a reasonable charge for the authorised work. Hours, materials and comparable charges may help. An invoice alone does not show that any amount chosen is reasonable.

If the plumber had instead quoted £500 and the customer accepted, that agreement would normally be the starting point. Properly agreed extras could still change the total.

CONSUMER LAW 06

Putting faulty work right or reducing the price

Where a consumer service fails the required standard, the customer may require the trader to correct it. The law calls this repeat performance. It means doing what is needed to bring the service into line with the contract, rather than automatically repeating every part of the job.

The trader must pay the necessary correction costs. The correction must be completed within a reasonable time and without significant inconvenience to the customer.

If correction is impossible, or the trader fails those requirements after being asked, an appropriate price reduction can become available. This reduces the bill or refunds an appropriate amount already paid. In some cases the reduction can reach the whole price.

These rules are in sections 54–56 of the Consumer Rights Act. Other remedies, including compensation, can also apply. Different routes can apply to delay or certain broken information promises. There is no universal rule that every complaint requires another attempt or a full refund.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner pays for a level tiled floor, but poor installation leaves the tiles uneven. The homeowner asks the tiler to correct it. If the work failed the required standard, the necessary correction should not bring a second labour or materials bill.

If correction is impossible, or the tiler fails to correct it within a reasonable time and without significant inconvenience, the price-reduction route becomes relevant. The amount should reflect the circumstances; uneven tiles do not automatically mean every pound paid must be refunded.

CONSUMER LAW 07

Unfair terms, deposits and cancellation fees

A consumer term can be unfair if it gives the trader a significant unfair advantage at the customer’s expense and is contrary to fair and open dealing. An unfair term is not binding on the consumer.

Examples that may need checking include excessive cancellation charges, an unrestricted power to change a fixed price or an attempt to remove legal service rights. The words ‘non-refundable deposit’ do not, by themselves, settle whether the trader can keep the money.

However, a customer who changes their mind does not always have a right to a full refund. First distinguish a legal cooling-off cancellation from cancellation outside that right. Then check the agreement, the applicable law and the basis for any charge.

FICTIONAL TRADES EXAMPLE

Fictional example: Outside any cooling-off right, a customer cancels a decorating booking. The decorator saves the materials and labour costs and fills the same slot with another job. A term still demands the full original price.

Why it matters: a charge far beyond the trader’s justified loss may be unfair. The trader should explain the basis of the charge. The customer should not assume that every cancellation automatically means the deposit must be returned in full.

CONSUMER LAW 08

Goods, installation and guarantees

A fitted boiler or window involves a product as well as work. Consumer law sets standards for goods, including satisfactory quality and, where applicable, suitability for a purpose made known to the trader.

If the supply contract includes installation by the supplier or under its responsibility, incorrect installation can also mean the goods fail to meet that contract. If one business sells the product and another is separately hired to fit it, identify what each agreed to provide.

A manufacturer’s warranty can give extra protection. It does not automatically replace legal rights against the business that supplied the goods. Remedies for faulty goods have their own rules, so do not assume every product complaint follows the same steps as a workmanship-only complaint.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner buys a boiler from one heating company under a supply-and-install contract. The company fits it incorrectly. The customer can raise that installation problem with the supplying company; it is not automatically just a manufacturer’s-warranty issue.

If the homeowner bought the boiler from a retailer and separately hired an installer, a product fault and poor fitting may involve different businesses. Keep both contracts and evidence showing which problem caused the loss.

Read the law: Consumer Rights Act 2015: services and Consumer Contracts Regulations 2013: information and cancellation.

The real court decisions about statutory rights and fair terms explain related issues. Many consumer rights come directly from legislation: rules made by Parliament, rather than one particular court case.

AGENCY AND AUTHORITY

Who Must Pay When an Agent Orders Work?

A letting agent, property manager or employee may order work for someone else. Before deciding who owes the bill, ask two questions: who made the agreement, and did the person placing the order have permission to make it?

The person who owns the building is not automatically the customer under the repair contract.

AGENCY PRINCIPLE 01

Who places the order, and whom are they acting for?

An agent is a person or business acting for someone else. That other person or business is called the principal. A property manager may be the agent and a landlord the principal.

If an authorised agent clearly makes an agreement on a named principal’s behalf, the principal will usually be the customer under that agreement. But an agent can also contract in its own name or accept its own responsibility. Read the order and agreement together before deciding.

Check: the full legal name, whether the sender says they act for someone else, and what permission they had. A logo or property address alone does not answer these questions.

FICTIONAL TRADES EXAMPLE

Fictional example: A manager orders a repair ‘for and on behalf of ABC Properties Ltd’. The company has authorised that repair, and the accepted terms identify it as the customer. This supports the company owing the agreed bill. The manager’s involvement does not automatically make the manager personally responsible.

AGENCY PRINCIPLE 02

Actual authority: permission to place the order

Actual authority means the person or business really gave the agent permission to act. Permission can be stated directly, such as a written power to order repairs up to £500. Lawyers call that express authority.

Permission can also follow from the role and what the principal has allowed the agent to do. This is implied authority. It must be supported by the facts, rather than assumed from a job title.

Permission has limits. Being allowed to arrange routine maintenance does not necessarily include approving a major extension. Check the type of work and any spending limit.

FICTIONAL TRADES EXAMPLE

Fictional example: A landlord’s written instruction allows the manager to order plumbing repairs up to £500. The manager orders a £450 repair of that kind. It falls within the stated permission.

An £800 order would exceed that permission unless another part of the authority covered it. The next question would be whether the landlord gave further approval or created apparent authority, explained below. The price limit helps show why the two orders are different.

AGENCY PRINCIPLE 03

Apparent authority: what the customer led you to believe

Apparent authority can arise when the principal’s words or actions reasonably lead a contractor to believe the agent may make the agreement. It can matter even if the agent breaks a private instruction the contractor did not know about.

The contractor must have relied on something attributable to the principal when making the agreement. An agent simply saying ‘I have permission’ does not establish this on its own.

Check: what the principal told the contractor, any known history of approved orders, and whether the contractor knew of a limit. The belief must be reasonable for this particular job.

FICTIONAL TRADES EXAMPLE

Fictional example: A landlord emails a plumber saying that Alex, the property manager, can order ordinary repairs. Privately, the landlord limits Alex to £300. Alex orders a routine £650 repair, and the plumber knows nothing about that limit.

Why it matters: the landlord’s own email may support apparent authority if the plumber reasonably relied on it. The result depends on the email and circumstances. If the plumber knew about the £300 limit, the argument would be different.

AGENCY PRINCIPLE 04

When the agent does not reveal the customer

Three different situations must be kept separate:

  • Named principal: you know the agent is acting for a particular person or company.
  • Unidentified principal: you know the agent acts for someone else, but you do not know who that person is.
  • Undisclosed principal: you do not know the intermediary is acting for anyone else at all.

For example, ‘I act for a landlord whose name I have not given you’ describes an unidentified principal, not an undisclosed one.

Special rules can sometimes let an undisclosed principal bring or face a contract claim. The agent must have had actual permission and intended to act for that principal. The contract’s terms can still affect whether a claim is possible. The agent may also be a contracting party. Do not assume that revealing a landlord later automatically transfers the debt or removes the agent’s responsibility.

FICTIONAL TRADES EXAMPLE

Fictional example: A management company orders work entirely in its own name and never says it acts for a landlord. Later, it argues that the landlord should pay. That later statement does not, by itself, decide who owes the bill.

Compare an order stating, ‘We act for the landlord, whose details will follow.’ The contractor now knows about the agency, even though the landlord is unnamed. The two arrangements raise different legal questions. Keep the wording used when the work was agreed.

AGENCY PRINCIPLE 05

Letting agents, landlords and repair instructions

There can be two separate agreements around the same repair. The landlord may owe the tenant a duty to keep parts of the home in repair. Separately, someone makes a contract with the tradesperson to carry out and pay for the work.

A landlord’s duty to the tenant does not automatically identify who owes the tradesperson’s invoice. Nor does a management role automatically make the agent responsible for every bill.

Ask: who ordered the work, in whose name, with what authority, and on what payment terms?

FICTIONAL TRADES EXAMPLE

Fictional example: A management company expressly agrees to buy a £900 boiler repair in its own name and pay the plumber. The landlord may separately have repair duties to the tenant.

Why it matters: the landlord’s repair duty does not automatically replace the company’s payment promise. If the manager instead made an authorised contract clearly on the landlord’s behalf, the payment relationship could be different.

AGENCY PRINCIPLE 06

Can later approval make an unauthorised order binding?

Sometimes an agent orders work on another person’s behalf without the required permission. That person may later approve the transaction, if the legal conditions are met. This is called ratification.

Clear approval of the whole transaction, with knowledge of the important facts, can matter. Merely owning the property or benefiting from the work does not automatically prove approval.

Where permission is uncertain, ask the proposed customer to confirm the work and price in writing before starting. Do not rely on the hope that someone will approve it afterwards.

FICTIONAL TRADES EXAMPLE

Fictional example: A manager orders £3,000 of rewiring on a landlord’s behalf without permission. After seeing the full order and price, the landlord writes that they approve that order and will pay under it.

This may support later approval of the transaction. A landlord simply receiving the completed work is not the same evidence. Keep the complete correspondence, because ratification has legal conditions.

AGENCY PRINCIPLE 07

Can the agent itself owe the money?

An agent can itself be responsible if it makes the contract in its own name or agrees to take responsibility. Special rules can also apply where it acted for an undisclosed principal.

There is another possible issue if an agent wrongly claims to have permission. A promise about having authority is called a warranty of authority. Breaking that promise can sometimes lead to a separate compensation claim. It does not automatically make the agent owe the invoice under the original work contract.

Before claiming: identify the exact person or business you say is responsible and why. Check the order, quotation, signatures and full messages. Earlier payments may help explain the dealings, but do not decide every later contract.

FICTIONAL TRADES EXAMPLE

Fictional example: A managing company accepts a quote as the customer and says it will pay from its own account. That can support a claim against the company.

Compare a manager saying only, ‘We will arrange payment for the landlord.’ That might describe an administrative role. Read the whole agreement before treating the two statements as the same promise.

Read more: Berge Bulk Shipping v Taumata Plantations [2025] EWCA Civ 876 explains rules about an undisclosed principal. The distinction from an unidentified principal is explained in Gregor Fisken Ltd v Carl [2021] EWCA Civ 792, paragraph 17.

See our explanation of the agency case and fictional agency and subcontractor examples.

Landlord and Tenant Act 1985, section 11 sets out certain landlord repair duties to tenants. Those duties are separate from the agreement about paying the contractor.

CONTRACTORS & SUBCONTRACTORS

Who Pays Whom — and Who Is Responsible for the Work?

A customer may hire a builder, who then hires a plumber or another trade. The builder is the main contractor. The trade hired by the builder is a subcontractor. Start by identifying who agreed to do what, and who agreed to pay. Different rules may apply to payment, tax and site safety.

SUBCONTRACTOR RULE 01

Separate agreements: customer, builder and subcontractor

There are often two separate contracts: the customer’s agreement with the builder, and the builder’s agreement with the subcontractor. Each can have its own price, work description and payment dates.

The subcontractor normally asks the builder for payment. The homeowner does not automatically owe that bill just because the work improved their home. Similarly, the homeowner cannot automatically enforce the builder’s subcontract.

A different result needs a legal reason. For example, the homeowner might separately promise to pay, or a contract might give them a right to enforce a particular promise. A collateral warranty is a separate promise made to another person, such as the building’s owner or tenant. An assignment is a legal transfer of a right to someone else. The wording and legal requirements must be checked.

A claim for careless work that damages property may raise separate negligence rules. It does not make the two contracts into one.

FICTIONAL TRADES EXAMPLE

Fictional example: A building company hires a roofer for £3,000. The homeowner has no separate agreement with the roofer. The roofer’s payment claim is normally against the building company. The homeowner paying the builder late does not, by itself, turn the homeowner into the roofer’s customer.

SUBCONTRACTOR RULE 02

Who is responsible for a subcontractor’s faulty work?

A builder does not usually escape a promise to the customer by hiring someone else to do the work. If the builder promised a properly tiled bathroom, using a subcontractor does not remove that promise.

The customer may have a contract claim against the builder. The builder may then have a separate claim against the tiler under their subcontract. Each claim needs evidence of what was promised, what went wrong and the resulting loss.

Where the dispute concerns damage caused on site, identify what each person actually did. Being present at the property is not proof that someone caused the damage.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner pays a builder to supply and fit a bathroom. The builder hires a tiler, whose work is defective. The homeowner can raise the broken promise with the builder. The builder cannot answer simply, “The tiler is self-employed.” Any claim the builder has against the tiler is a separate matter.

SUBCONTRACTOR RULE 03

The work, extra charges and money held back

A subcontract should say what work is included, the price or hourly rate, the dates and who can approve extra work. It should also explain how payment is requested and when it is due.

A variation is an agreed change to the original job. Before doing extra work, record what is changing, its price and who has authority to agree it. Check any rule requiring written approval. A site manager asking for a change does not always have authority to promise extra payment.

Retention is an agreed amount held back until a stated condition is met. For example, the contract might allow 5% to be held until specified finishing defects are corrected. The customer cannot invent a retention after the event.

An unsigned subcontract can still matter if the parties agreed its terms through messages or their actions. Keep the proposed terms and the messages showing what was accepted.

FICTIONAL TRADES EXAMPLE

Fictional example: A plumber’s £1,800 price covers fitting hidden pipes before the walls are closed. Fitting taps afterwards is outside that agreed work. The builder’s authorised manager approves an extra £400 by email. That email helps show a separate price was agreed. Without it, the plumber would need other evidence that the extra work and payment were authorised.

SUBCONTRACTOR RULE 04

When do special construction-payment rules apply?

The Housing Grants, Construction and Regeneration Act 1996, often called the Construction Act, gives special rights under certain construction contracts. Many building, repair, alteration and maintenance jobs can fall within it. Some activities and contracts are excluded.

For a contract covered by the Act, there must be rules for calculating payment and deciding when it is due. Formal payment notices can affect what must be paid now. The Act also provides a way to ask an independent specialist to decide a dispute, called adjudication.

A missing signature does not automatically prevent these rules applying. An agreement made by email or spoken words can be covered. Check the type of work, the people who made the contract and the exclusions before relying on the Act.

FICTIONAL TRADES EXAMPLE

Fictional example: Two businesses agree a building subcontract by email and the subcontractor starts work. The main contractor later says payment-notice rules cannot apply because no paper contract was signed. That is not enough: an unsigned agreement can still be covered by the Construction Act.

SUBCONTRACTOR RULE 05

Homeowner contracts: when payment rules differ

The Construction Act’s payment and adjudication rules do not cover every job. One important exclusion concerns a contract mainly for work on a house or flat which one of the contracting parties lives in, or intends to live in, as their home. This is called the residential-occupier exclusion.

Look at each contract separately. The homeowner’s contract with a builder may be excluded. The builder’s subcontract with a plumber on that same house may still be covered. A landlord arranging work on a tenant’s home is not automatically treated like an owner arranging work on their own home.

This is a different question from whether someone is a consumer under consumer law. Also check whether the parties agreed a dispute process in their contract, even if the Act does not provide one.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner hires a builder to renovate the house they live in. The builder hires a plumber for £3,000. The homeowner–builder contract may fall within the residential-occupier exclusion. That does not automatically exclude the separate builder–plumber contract. The address is the same; the contracting parties are different.

SUBCONTRACTOR RULE 06

Requests for payment and notices reducing payment

For a construction contract covered by these rules, distinguish the due date, when a payment becomes due, from the final date for payment, the deadline for paying it.

A payment notice states the amount considered due and how it was calculated. Depending on the contract, the person paying or the person being paid gives it. If a required notice is missing, the law can allow a replacement notice or treat an earlier valid payment application as the notice.

The amount established under these notice rules is the notified sum. To pay less, the payer usually needs a valid pay less notice. It must state the amount considered due and its calculation, and arrive within the required time.

The contract and the legal rules control the dates and method. A general complaint about workmanship is not necessarily a valid notice. A duty to pay the notified sum now can exist even while the final value of the work remains disputed.

FICTIONAL TRADES EXAMPLE

Fictional example: Under a covered subcontract, the notice rules establish £5,000 as the notified sum. The builder believes £1,000 should be deducted but misses the deadline for a valid pay less notice. Subject to any applicable exception, £5,000 may have to be paid now. That does not finally decide whether the work was worth £5,000; a later assessment can address that question.

SUBCONTRACTOR RULE 07

Quick dispute decisions, stopping work and delayed payment

Adjudication is a construction-dispute process in which an independent adjudicator gives a decision. For contracts covered by the Act, a party can normally refer a dispute at any time. The decision is usually binding for the time being. A court, arbitration or later agreement can finally resolve the dispute. Adjudication is different from a County Court small claim.

The Act can also allow work to be suspended for specified non-payment. The legal conditions must be met, including giving at least seven days’ notice stating the grounds. An overdue invoice alone is not permission to walk off site immediately.

A pay-when-paid clause says the contractor will pay a subcontractor only after receiving money from someone else. Such a clause is generally ineffective under a covered contract. There is a specific exception involving insolvency, so check the contract and the facts.

FICTIONAL TRADES EXAMPLE

Fictional example: A builder owes a plumber £3,000 under a covered subcontract. The homeowner has not paid the builder, but nobody in the payment chain is insolvent. A clause saying “we pay you when the homeowner pays us” does not normally excuse non-payment. The builder’s customer debt and its debt to the plumber are separate.

SUBCONTRACTOR RULE 08

Tax taken from subcontract payments (CIS)

The Construction Industry Scheme (CIS) is a tax system for certain payments to construction subcontractors. A contractor checks the subcontractor’s status with HMRC. Where a deduction is required, the contractor takes the correct amount from the payment and pays it to HMRC.

The calculation excludes certain amounts, including eligible materials costs, under HMRC’s rules. The contractor must keep records, provide the required payment and deduction statement and report the payments.

A CIS deduction is a payment towards tax. It does not change the agreed price for the work or give the contractor a general right to withhold the whole bill. CIS registration also does not, by itself, prove someone is self-employed for employment rights.

FICTIONAL TRADES EXAMPLE

Fictional example: A labour-only subcontractor is owed £1,000, with no VAT or other excluded costs in this example. HMRC says the deduction rate is 20%. The contractor pays £800 to the subcontractor and accounts for £200 to HMRC. The £200 must be shown as a tax deduction; it is not a discount on the agreed price or money the contractor can simply keep.

SUBCONTRACTOR RULE 09

Is a subcontractor really self-employed?

Calling a person “self-employed” in a contract does not settle their legal status. The real working arrangement matters. For example, who controls the work, whether the person must do it personally, and whether they are running their own business can be relevant.

Employee, worker and self-employed person are different legal categories. Employment rights and tax status must be considered under their own rules. Paying someone through CIS does not answer every employment question.

Site safety is another separate issue. Under the Construction (Design and Management) Regulations 2015, a principal contractor manages construction health and safety on projects needing that role. The title does not, by itself, identify who owes a particular invoice.

FICTIONAL TRADES EXAMPLE

Fictional example: An installer works fixed hours, must do the job personally and follows a manager’s detailed instructions. The contract calls the installer self-employed. Those facts need to be assessed; the label alone does not decide employment rights. Separately, the payment agreement identifies who owes the installer money, and safety rules identify who manages the site.

Read the official sources: Construction Act 1996; contracts with residential occupiers; rights given to someone outside a contract; HMRC’s CIS guide; HSE’s contractor safety duties; and ACAS employment-status guidance.

This is general information for England and Wales. Payment notices, suspension and adjudication have detailed rules. Check them for your contract before acting. See construction contract cases and fictional trades examples.

LATE PAYMENTS, DEBTS AND BUSINESS RISK

Getting Paid: Interest, Deductions and Customers Who Cannot Pay

Start with who owes the money, how much is due and the payment date. Some business debts allow extra interest and a fixed recovery charge. Different rules apply when the customer is a consumer, when deductions are disputed, or when a company cannot pay its debts.

PAYMENT PRINCIPLE 01

When is a trades invoice actually due?

Check the agreed payment terms. Payment might be due on a fixed date, after a stage of work or after an agreed completion certificate. An invoice cannot usually change those terms just by printing an earlier deadline.

If no payment date was agreed, the law may supply rules. For business debts, check the late-payment rules. For construction contracts, check whether the special payment rules apply.

If completion is disputed, identify exactly what remains unfinished and why it matters to the payment condition. Keep the quotation, work order, completion records, invoice and payment history together.

FICTIONAL TRADES EXAMPLE

Fictional example: The final £2,000 is due when a building reaches “practical completion”. This usually concerns whether the work is sufficiently complete for its intended use, but the contract matters. A missing door handle and a missing staircase are very different problems. The words on the invoice alone do not decide whether the payment condition has been met.

PAYMENT PRINCIPLE 02

Why consumer debts are different

The commercial late-payment charges below normally concern debts owed by businesses or public bodies. They do not automatically apply when an individual buys a repair for their private home.

A homeowner’s debt can still be overdue and enforceable. Interest might be available under a valid contract term or a court’s legal power to award it. Explain the correct reason for claiming interest; do not copy business-debt charges onto every invoice.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner owes £450 for repairing their own kitchen sink. The plumber cannot automatically add the £40 commercial recovery charge just because payment is late. The plumber must use the rules that apply to this consumer debt.

PAYMENT PRINCIPLE 03

Interest on late business payments

For a business debt covered by the Late Payment of Commercial Debts (Interest) Act 1998, the usual statutory interest rate is eight percentage points above the relevant Bank of England base rate. “Statutory” means the right comes from legislation.

This is an annual rate. Work out interest for the number of days the payment was late. Do not add the whole annual percentage as a one-off fee. Use the reference rate that applies to the relevant period, rather than assuming today’s rate applies throughout.

An agreed contractual interest remedy can affect whether the statutory rules apply. Check the contract, when payment became overdue and the dates of any part-payments.

FICTIONAL TRADES EXAMPLE

Fictional example: A letting agency orders maintenance in its own company name and agrees that it will pay. Its business debt of £1,000 is paid 30 days late. If the applicable annual interest rate were 12%, the calculation would be £1,000 × 12% × 30 ÷ 365 = £9.86. This rate is only an illustration; check the actual rate and whether the statutory rules cover the debt.

PAYMENT PRINCIPLE 04

Fixed late-payment charges: £40, £70 or £100

For a late business debt covered by the commercial-payment rules, the supplier can claim a fixed amount towards recovery costs:

  • £40 for a debt below £1,000.
  • £70 for a debt from £1,000 to below £10,000.
  • £100 for a debt of £10,000 or more.

The charge relates to a qualifying late payment. It is not a fresh charge for each reminder, and it does not automatically apply to a private homeowner. Interest is a separate calculation.

FICTIONAL TRADES EXAMPLE

Fictional example: A business separately orders two £600 jobs. Each creates a separate debt covered by the commercial late-payment rules, and both are paid late. The fixed amounts are £40 + £40 = £80. One covered debt of £1,200 instead attracts £70. Splitting one debt into extra invoices does not automatically create extra entitlements.

PAYMENT PRINCIPLE 05

Money held back and claims for deductions

A customer needs a legal or contractual basis for taking money off a bill. They should explain the defect or other claim, provide evidence and show the calculation.

Set-off means using a valid claim against the other party to reduce what is payable, where the law or contract allows. Retention means holding an agreed sum until a stated condition is met. A contract may also set an amount payable for specified delay, often called liquidated damages. The term still has to be legally valid. These are different reasons for a deduction; none should be assumed.

For a construction contract covered by payment-notice rules, a valid claim for defects does not remove the need to follow those rules. What must be paid now and the final amount owed can be different questions.

FICTIONAL TRADES EXAMPLE

Fictional example: A developer withholds an £8,000 subcontract payment, saying a defect will cost £300 to repair. The developer needs evidence for the deduction and must follow any applicable notice rules. A complaint about £300 does not, on its own, explain withholding all £8,000.

PAYMENT PRINCIPLE 06

Limited companies and personal guarantees

A limited company is legally separate from its directors and owners. If the company made the contract, it normally owes the bill. A director signing or ordering work for the company does not automatically promise to pay personally.

A personal guarantee is a separate promise by a person to pay if the company does not. Its wording and legal requirements matter. Other personal claims can exist, for example where a person’s own false statement creates a legal claim, but that needs a separate basis and evidence.

Check the company’s full registered name, number and the name on the agreement. A trading name is only a business label; it does not always identify the legal person who owes the money.

FICTIONAL TRADES EXAMPLE

Fictional example: The contract names Smith Developments Ltd and the director orders the work on its behalf. The company later closes its business. The director does not automatically owe the invoice personally. A valid personal guarantee could change that result; the director simply owning another successful business does not.

PAYMENT PRINCIPLE 07

What if the customer’s company cannot pay?

A company can be insolvent because it cannot pay its debts or because its debts exceed its assets. A formal process such as liquidation or administration may change how creditors can pursue payment.

In liquidation, a liquidator deals with the company’s affairs and available assets. In administration, an administrator manages the company under a legal rescue or recovery process. A creditor may need to send a proof of debt: a claim explaining the amount owed, with supporting documents.

Money is distributed under legal priority rules. A court judgment does not guarantee payment or automatically move an ordinary creditor to the front of the queue. Some court action or enforcement may be restricted.

A company removed from the register is dissolved. Restoring it to the register is a separate process. Check Companies House and insolvency notices before spending more on a claim.

FICTIONAL TRADES EXAMPLE

Fictional example: A subcontractor has a £7,000 judgment against a company that enters liquidation. The subcontractor should contact the liquidator about proving the debt. If little money is available after higher-priority claims, the subcontractor may receive only part of the £7,000 or nothing. Winning the case did not create money in the company.

PAYMENT PRINCIPLE 08

Settlements, payment plans and transferred debts

A full and final settlement is an agreement intended to end the identified dispute on stated terms. Write down the amount, payment dates and whether it covers the invoice, interest, fees and any counterclaim.

For an instalment plan, explain what happens if a payment is missed. Do not assume that any part-payment cancels the remaining debt, or that every offer to accept less has the same legal effect. Clear agreed wording matters.

A creditor can sometimes transfer the right to a debt to someone else. This is called assignment. The transfer, any required notice and any contract restrictions must be checked. A new name on a demand is not, by itself, proof of a valid transfer.

FICTIONAL TRADES EXAMPLE

Fictional example: A customer offers £3,000 to settle a disputed £5,000 bill. The parties should state whether £3,000 ends the whole dispute, or is only a payment towards it. If payment is by instalments, they should also agree what happens if an instalment is missed. Otherwise they may disagree later about whether the remaining £2,000 is still owed.

Official sources: interest on late business payments, fixed recovery charges and Companies House.

For the next steps, read Before Court and Running a Small Claim. For cases involving construction payments and insolvency, see Bresco and the other construction cases.

NEGLIGENCE PRINCIPLES

Negligence and Damage to Property

Negligence is a legal claim about a failure to take reasonable care which causes harm the law recognises. A poor result alone is not enough. This section explains the required duty, the careless act, the link to the damage and the loss claimed.

NEGLIGENCE PRINCIPLE 01

A broken agreement or a failure to take care?

A contract claim asks whether someone failed to do what their agreement required. A negligence claim asks whether they broke a legal duty to take reasonable care and caused harm for which the law allows compensation.

The same event can raise both questions, but a broken promise is not automatically negligence. The cost of correcting defective work itself is often dealt with through contract or consumer law.

Negligence is especially relevant where careless work injures someone or damages other property. It can also matter when the injured person never hired the contractor, such as a neighbour whose property is damaged.

FICTIONAL TRADES EXAMPLE

Fictional example: A plumber fits a faulty pipe. The customer may use their contract rights to seek the cost of correcting it. If the pipe leaks and damages the kitchen below, that additional damage may also support a negligence claim. The customer still needs to show what the plumber did wrong and how it caused the damage.

NEGLIGENCE PRINCIPLE 02

Did the contractor owe a duty to take care?

A duty of care is a legal responsibility to take reasonable care to avoid certain harm to another person. Tradespeople can owe duties to people affected by their work, including people who did not hire them.

The duty has limits. The court considers the relationship, the risk and the kind of loss claimed. It does not assume that everyone owes everyone else a duty to prevent every financial loss.

Start with a clear question: what harm should this person reasonably have taken care to avoid when doing this work?

FICTIONAL TRADES EXAMPLE

Fictional example: A scaffolder works beside a neighbour’s roof. The neighbour never hired the scaffolder. That does not remove the duty to take reasonable care not to damage the roof. The neighbour would still need evidence of careless work, resulting damage and the loss claimed.

NEGLIGENCE PRINCIPLE 03

What care should a competent tradesperson take?

The court asks what a reasonably competent person doing that type of work should have done. It considers the risks and the circumstances at the time. Relevant evidence can include trade practice, drawings, safety rules, manufacturer instructions and warnings.

A breach of duty means the person fell below that required standard of care. Something going wrong is not enough by itself. Equally, saying “I always do it this way” does not prove that the method was reasonable.

If a contractor claims specialist skills, that claim may be relevant to the standard expected.

FICTIONAL TRADES EXAMPLE

Fictional example: A manufacturer’s instructions require a particular protective fitting, but the electrician leaves it out. Those instructions help explain what a competent installer should have done. To claim compensation, the customer must also connect the failure to the loss being claimed.

NEGLIGENCE PRINCIPLE 04

Did the failure actually cause the damage?

Causation means the link between what someone did wrong and the damage claimed. The person bringing the claim normally has to show that link. Showing careless work and showing damage are not enough if the two are unrelated.

Ask whether earlier defects, later alterations, weather or another contractor’s work could explain the damage. The fact that a problem appeared after a visit does not, on its own, prove that visitor caused it.

Use dated photographs, job sheets, messages and a timeline. Where the cause is technical, a suitably qualified person’s evidence may be needed.

FICTIONAL TRADES EXAMPLE

Fictional example: A roof leaks after scaffolding is removed. Earlier photographs show a cracked tile in the same area. The owner needs evidence explaining whether the scaffold work caused new damage or the old crack caused the leak. The timing alone does not choose between those explanations.

NEGLIGENCE PRINCIPLE 05

Which losses can be claimed?

Negligence can provide compensation for injury and physical damage to property. Financial losses resulting from that harm may also be recoverable if the legal tests are met.

The rules are more restrictive where the loss is only financial. Lawyers call this pure economic loss. For example, the cost of replacing a defective item itself may be treated differently from the cost of repairing other property it damaged.

This does not mean the customer has no remedy for the defective item. Contract rights, consumer rights or a specific legal duty may provide one. Identify each loss and the legal reason for claiming it; avoid counting the same loss twice.

FICTIONAL TRADES EXAMPLE

Fictional example: A badly fitted valve needs £80 of corrective work and causes £4,000 of water damage to a ceiling and flooring. Keep the two amounts separate. The £80 may be claimed under the installation contract; the £4,000 may also raise negligence. The claimant must prove the cause and reasonable repair costs.

NEGLIGENCE PRINCIPLE 06

When more than one contractor may be responsible

More than one person can contribute to the same damage. The court may need to decide what each person did and whether each is legally responsible.

Being the last trade on site does not automatically make someone responsible for everything discovered afterwards. Separate each allegation and the evidence supporting it.

A person held liable can sometimes seek a contribution from another person responsible for the same damage. This means asking that person to pay an appropriate share. It is a separate legal issue from simply dividing the bill equally among everyone who attended.

FICTIONAL TRADES EXAMPLE

Fictional example: A plumber fits a pipe joint and a later contractor alters it. The joint then leaks. The investigation should identify its original condition, the later change and the cause of failure. The plumber is not automatically responsible because they first installed it, and the later contractor is not automatically responsible because they touched it last.

NEGLIGENCE PRINCIPLE 07

Did the customer help cause or increase the damage?

Contributory negligence concerns a person’s own unreasonable conduct helping to cause their injury or damage. Where the rule applies, compensation can be reduced to reflect their share of responsibility. It does not automatically defeat the whole claim.

Mitigation means taking reasonable steps to limit a loss. If someone could reasonably prevent extra damage but does not, they may be unable to recover that avoidable extra cost.

These questions can overlap, but they are different. One asks whether the claimant helped cause the harm. The other asks whether they reasonably limited the loss. A claimant does not have to take unsafe steps or accept any proposal the other side makes.

FICTIONAL TRADES EXAMPLE

Fictional example: A faulty fitting causes a leak. The customer is told how to stop further damage safely and has a reasonable opportunity to do so, but leaves the water running for days. The original fault may still support a claim. The avoidable extra damage is a separate issue and may reduce what can be recovered. If stopping the leak was unsafe or impractical, that could change the assessment.

NEGLIGENCE PRINCIPLE 08

What evidence is needed?

The person alleging negligence normally needs to establish four things:

  1. A duty to take reasonable care.
  2. A failure to meet that duty.
  3. A link between that failure and the damage.
  4. A loss for which the law allows compensation.

The usual civil standard is more likely than not, called the balance of probabilities. Match each disputed point to evidence: photographs, job records, messages, repair bills or witnesses with first-hand knowledge.

Technical disputes may need expert evidence. Court permission is required to use expert evidence at a small-claims hearing. A repair quotation is not automatically an independent expert report about the cause.

FICTIONAL TRADES EXAMPLE

Fictional example: A photograph shows a damaged ceiling. A dated job sheet records which pipe was repaired. A report explains how a faulty joint caused the leak, and an invoice records the reasonable repair cost. These documents answer different questions. The ceiling photograph alone does not establish all of them.

This is general educational information. TDD mainly supports eligible contract and payment disputes. Complex negligence claims may need specialist legal advice. See the fictional damage and safety examples and related court cases.

BUILDING, SAFETY & COMPLIANCE

Building Regulations and Safety Rules for Tradespeople

Agreeing a price and finishing the work are only part of a contractor’s responsibilities. Building, safety, environmental and property rules can also require permissions, certificates, qualifications or particular working methods. Breaking one of those rules and owing compensation to a customer are separate legal questions.

COMPLIANCE TOPIC 01

Building Regulations and planning permission

Planning permission concerns whether a proposed development is allowed, including matters such as its use, size and appearance. Building Regulations set standards for how work is designed and built, including structure, fire safety and energy use. Some jobs need both.

Building-control approval or notification may be needed for work such as extensions, roof changes, heating or electrical installations. Approval for planning purposes does not replace building-control requirements.

Before starting, identify which rules apply, who will arrange approval and what completion documents must be provided. England and Wales can have different requirements.

Read the official guide to Building Regulations approval.

FICTIONAL TRADES EXAMPLE

Fictional example: A homeowner obtains planning permission for a loft conversion. Structural work also needs building-control approval. The builder cannot assume that the planning permission covers that separate requirement. The permission to develop and the checks on how it is built serve different purposes.

COMPLIANCE TOPIC 02

Who can certify work, and which records are needed?

A competent-person scheme lets a registered installer certify that specified work complies with Building Regulations. For work covered by the scheme, this can replace a separate building-control application. Registration must cover the actual type of work.

Electrical work can require testing, an installation certificate and, for certain jobs, notification under Building Regulations. These documents have different purposes. Part P is the part of the regulations dealing with electrical safety in homes; the notification rules differ between England and Wales.

Agree who will arrange the required notification, inspections and certificates. A promise to supply a certificate is not fulfilled merely because the equipment switches on.

Read the official building-control guidance.

FICTIONAL TRADES EXAMPLE

Fictional example: An electrician replaces a home’s consumer unit, the box containing circuit breakers. The homeowner should receive the documents required for that work. An electrical test certificate and a Building Regulations compliance certificate answer different questions, so asking only for “the certificate” may leave an important document missing.

COMPLIANCE TOPIC 03

Qualifications for gas and refrigerant work

For regulated gas work, use a Gas Safe registered business and an engineer qualified for that category of work. Registration for one type of appliance does not authorise every type of gas job. Check the engineer’s registration and the work categories on their card.

F-gases are gases used in some refrigeration, air-conditioning and heat-pump systems. Work on equipment containing them can require individual qualifications and, for businesses working on other people’s equipment, company certification. The exact requirement depends on the equipment and task.

Electrical work has its own competence and building-control rules. A general builder’s title does not replace any specialist requirement.

Gas-work registration requirements; individual F-gas qualifications; F-gas company certification.

FICTIONAL TRADES EXAMPLE

Fictional example: A builder includes a gas-boiler replacement in the job and uses someone who is not properly registered for the gas work. The boiler producing heat does not make that lawful. Any customer’s claim about the bill or the cost of putting matters right still needs its own contractual or other legal basis.

COMPLIANCE TOPIC 04

Who must plan and manage building-site safety?

The Construction (Design and Management) Regulations 2015, usually called CDM, set responsibilities for managing construction health and safety. They cover clients, designers and contractors.

For a private homeowner’s project, the client’s duties normally pass to the sole contractor. On a project with more than one contractor, they normally pass to the principal contractor, who manages construction safety. In some circumstances a principal designer can take on the client’s duties through a written agreement.

If the homeowner has not appointed a principal contractor, the contractor controlling construction takes on the relevant duties under the rules. This safety role does not automatically identify who owes each subcontractor’s invoice.

HSE guidance on safety duties for domestic projects.

FICTIONAL TRADES EXAMPLE

Fictional example: A builder manages a home renovation involving a plumber and an electrician. The homeowner is not expected to organise construction safety simply because they own the house. The CDM roles need to be identified, and the contractor controlling the work may carry the relevant duties even if nobody used the title “principal contractor”.

COMPLIANCE TOPIC 05

Work at height, scaffolding and safe access

Work at height means work where a fall could cause injury. It can include ladders, roofs and work beside an opening; it is not limited to tall buildings.

The Work at Height Regulations 2005 require suitable planning, competent people and precautions against falls. The equipment and method must suit the task and its risks. Ladders are not banned, but they are not suitable for every job.

A customer’s instruction to “just get it done” does not remove safety duties. Permission to enter neighbouring land or use a neighbour’s roof is also a separate issue.

HSE guidance on ladders, scaffolds and roof work.

FICTIONAL TRADES EXAMPLE

Fictional example: A roofing contractor uses an unstable ladder for work that needs a safer access method. Finishing without anyone falling does not prove the method complied with the law. Safety rules address the risk of injury, not only accidents that actually happen.

COMPLIANCE TOPIC 06

Asbestos and hazardous materials

Older buildings can contain asbestos in insulation, boards and other materials. Disturbing it can release harmful fibres. The Control of Asbestos Regulations 2012 require suitable assessment, information, training and controls. Some work requires a licensed contractor.

The legal duty to manage asbestos applies to non-domestic premises and common parts of multi-occupancy homes. Common parts include shared stairs and corridors. An owner-occupied private home is treated differently, but contractors still have duties when working with possible asbestos.

Do not assume a material is safe because no asbestos register was provided. If suspect material is found, stop the activity that might disturb it and arrange a suitable assessment before continuing. The safe method and any licensing requirement depend on the material and the work.

HSE guidance on providing asbestos information to workers.

FICTIONAL TRADES EXAMPLE

Fictional example: A plumber finds old insulation around pipes in the shared basement of a block of flats. The absence of paperwork does not justify cutting it away. The material and the planned work need to be assessed so the correct training, controls and any licensed contractor can be arranged.

COMPLIANCE TOPIC 07

Construction waste and environmental responsibilities

A waste carrier transports waste as part of a business. A waste broker arranges for other people’s waste to be transported or dealt with. These activities can require registration. The registration concerns the person or business, not a separate licence for each van.

Waste must go through a lawful disposal route, with the required records. Carrying your own building waste does not automatically exempt the business from registration. Construction and demolition waste can require upper-tier registration, including when the business produced it.

Check the correct registration category with the Environment Agency if based in England, or Natural Resources Wales if based in Wales. Keep records showing what was removed, who took it and where it went.

Check England’s waste-carrier register; waste-carrier registration in Wales.

FICTIONAL TRADES EXAMPLE

Fictional example: A builder’s price includes removing rubble and old bathroom fittings. That does not remove the waste-law duties. The builder should use the correct registration and lawful disposal route, and retain the required records. A customer asking for rubbish to be removed does not authorise fly-tipping.

COMPLIANCE TOPIC 08

Neighbours, boundaries and Party Wall rights

A party wall is commonly a wall shared by adjoining properties. The Party Wall etc. Act 1996 also covers certain boundary walls and nearby excavation. Some work requires the building owner to give formal notice before starting.

The Act can provide a process for resolving disagreements, protecting neighbouring property and compensating for damage. Planning permission does not replace that process.

Access is a separate question. The Act contains limited access rights subject to conditions; it is not a general right to enter a neighbour’s garden or put scaffolding on their roof. Check whether consent or a statutory procedure is needed.

Official explanation of party-wall notices, disputes and access.

FICTIONAL TRADES EXAMPLE

Fictional example: An extension requires cutting into a shared wall and placing scaffolding on a neighbour’s land. The owner and contractor should establish the required notices and the legal basis for access before work starts. The customer’s ownership of their own house does not give them unlimited control over the neighbouring property.

COMPLIANCE TOPIC 09

Insurance and promises to cover another person’s loss

Public liability insurance can cover certain claims for injury or damage to other people’s property. It is often required by a contract, but it is not legally compulsory for every trade.

Employers’ liability insurance covers certain claims by employees and is required for many employers, subject to exceptions. Professional indemnity insurance can cover claims about professional services or advice. The cover depends on the policy.

An indemnity in a contract is a promise to meet a specified loss or liability; it is not itself an insurance policy. Read the wording.

Insurance and legal responsibility are different questions. An insurer refusing cover does not automatically mean the contractor is not liable. An insurer accepting a claim does not replace the court’s role in deciding a disputed legal claim.

Employers’ Liability (Compulsory Insurance) Act 1969.

FICTIONAL TRADES EXAMPLE

Fictional example: A customer claims for water damage after plumbing work. The insurer says a policy exclusion applies. The customer still needs to establish who caused the damage and the amount legally recoverable. The insurance decision concerns cover; it does not, by itself, answer whether the plumber owes compensation.

COMPLIANCE TOPIC 10

Building safety and higher-risk buildings

Certain buildings have additional safety and building-control rules because of their height, use and other features. The legal category is called a higher-risk building. Do not decide that category from height alone.

In England, the Building Safety Regulator handles building-control approval for buildings within the relevant higher-risk category. Some work needs approval before it starts, together with evidence that the design, construction and management meet the rules.

In Wales, local authorities oversee building-control approval for higher-risk buildings. The Welsh definition and procedures differ. The English regulator’s process should not simply be applied to a Welsh project.

There can also be separate fire-safety and occupied-building duties. Identify the country, building, work and responsible people before deciding which approval or safety rule applies.

Higher-risk building approval in England; higher-risk building approval in Wales.

FICTIONAL TRADES EXAMPLE

Fictional example: A contractor is asked to carry out fire-safety repairs in a tall block of flats. Before quoting or starting, they check whether the building and work fall within the higher-risk rules. For work covered by the Welsh higher-risk regime, the building-control authority is the local authority, not England’s Building Safety Regulator. An ordinary house-repair process may be unsuitable.

These rules are wider than an unpaid-invoice dispute. A safety or approval failure may lead to regulatory action; a claim for money still needs its own legal basis and evidence. Use the linked legislation and current official guidance for the work and country involved.

For examples of how courts have applied related duties, see building-defect and safety cases. This section concerns England and Wales; requirements differ by trade, project and location.

BEFORE COURT

Before You Start a Court Claim

Before starting a court claim, check who made the agreement, what went wrong and what outcome you want. Work out the amount, keep the evidence and give the other side a fair chance to respond.

The steps required before court are called pre-action steps. The right steps depend on the people involved and the type of dispute.

PRE-ACTION STEP 01

Who should you bring the claim against?

The claimant starts the claim. The defendant is the person or business the claim is against. Start by checking who actually made the agreement.

A limited company is normally separate from its directors. A sole trader is an individual running a business, even if they use a business name. A letting agent and a landlord are also different parties.

Fictional example: A quotation names ABC Repairs Ltd and the company accepts it. The director later stops answering calls. That does not, by itself, make the director personally responsible for the company’s bill.

Check the quotation, work order, messages and payment records. Where an agent placed the order, check whom it was acting for and whether it had permission. Naming the wrong defendant can make an otherwise valid claim fail.

PRACTICAL CHECKS

  • Identify each person or company by its full legal name and address.
  • Check company status and registration where relevant.
  • Keep the document showing who ordered the work.

PRE-ACTION STEP 02

What is the deadline for starting a claim?

Limitation means the legal time limit for starting a claim. For an ordinary contract claim in England and Wales, the usual limit is six years from when the right to sue arose. For an unpaid bill, this often means when payment became due and was not made.

Fictional example: An invoice is sent before the work finishes, but the agreement says payment is due after completion. The invoice date alone does not tell you when the six-year period starts.

Different claims and special circumstances can have different rules. Sending a demand letter or discussing settlement does not, by itself, stop time running. If a deadline may be close, get advice promptly.

PRACTICAL CHECKS

  • Identify when the alleged breach occurred.
  • Check whether a payment or written admission of the debt affects the time limit.
  • Do not assume an outstanding invoice has unlimited time.

PRE-ACTION STEP 03

How much can you claim, and why?

Show how you reached the amount claimed. Start with the agreed price, add any properly agreed extra work, then subtract payments and credits. List any disputed deduction or other loss separately and explain it.

Fictional example: A decorating job costs £2,400 and the customer pays a £600 deposit. The starting unpaid balance is £2,400 − £600 = £1,800. If the customer says one room was unfinished, explain that dispute rather than treating the invoice as the whole answer.

Only add interest, recovery charges or other fees where the law or agreement allows them. The special charges for late business payments do not automatically apply to a private homeowner.

PRACTICAL CHECKS

  • Show each invoice, credit and payment.
  • Explain the basis for any interest or fees.
  • Do not guess a loss or claim the same loss twice.

PRE-ACTION STEP 04

Keep the evidence before it disappears

Evidence is the material used to establish what happened. Keep the original quote, work order, invoices, messages, photographs, videos, delivery notes and bank records.

Make a short timeline: date, event and the document that supports it. This helps the other side and the judge follow the story.

Fictional example: Keep the full message conversation showing that a customer approved an extra radiator and its price. One screenshot saying “go ahead” may leave out what was being approved.

Keep original files and complete conversations. Do not alter photographs or discard records because they are unhelpful to your case.

PRACTICAL CHECKS

  • Keep original files and full message threads.
  • Date key events and label supporting records.
  • Keep relevant evidence even if it does not help your argument.

PRE-ACTION STEP 05

Give the other side a fair chance to respond

Explain the problem in writing. Say what work was agreed, what happened, what is disputed and what you want done about it. Keep the tone calm and specific.

Fictional example: A customer says “the bathroom is wrong” and refuses to pay. Ask which items are defective, what correction is needed and how any deduction was calculated. Photographs and a repair quotation may help explain the complaint.

Where workmanship is disputed, consider a suitable inspection and an appropriate chance to put things right. Record requests, replies and offers. The right remedy depends on the agreement, the problem and any consumer rights that apply.

PRACTICAL CHECKS

  • State the disputed issue and requested remedy.
  • Ask for specific documents or defect details.
  • Keep a record of offers to inspect the work or resolve the problem.

PRE-ACTION STEP 06

Which rules apply before starting court proceedings?

A pre-action protocol is a set of steps for exchanging information and trying to resolve a dispute before court. Start by checking whether a particular protocol covers your claim.

  • Construction and engineering disputes: these have their own protocol. Read its requirements and exceptions before choosing a process.
  • A business seeking a debt from an individual: the Debt Claims Protocol generally applies, including where that individual is a sole trader, unless another protocol covers the claim. It requires particular information and documents. Where there is no reply, the normal minimum wait is 30 days after the Letter of Claim. A reply or request for documents can affect the next steps and timing.
  • No specific protocol: the general pre-action guidance calls for a reasonable exchange of information and time to respond.

Do not choose a deadline only because the customer is a homeowner or a business. First identify the type of claim and the rules that cover it.

Construction and Engineering Disputes Protocol

Debt Claims Protocol · Practice Direction on Pre-Action Conduct · Debt Claims Protocol amendment effective 1 October 2026

Where the Debt Claims Protocol applies, check its current delivery requirements. The October 2026 amendment says a creditor who has the debtor’s personal email address should also send the Letter of Claim there. If no personal email is known but another personal electronic contact is known, use at least one such method as well. This supplements the protocol’s postal requirements.

PRACTICAL CHECKS

  • Check which set of steps must be followed before court.
  • Allow the time to reply required by the correct process.
  • Consider reasonable ways to settle before starting a claim.

PRE-ACTION STEP 07

What should a Letter Before Action say?

A Letter Before Action, also called a Letter of Claim, explains your case before you start court proceedings. Sending it does not mean a court claim has begun.

The letter should identify both parties, describe the agreement or legal duty, explain what went wrong and state the outcome sought. Show the calculation and provide the information and documents required by the relevant pre-action rules.

Fictional example: For an unpaid decorating balance, explain the £2,400 agreed price, the £600 already paid and why you say the remaining £1,800 is due. Address any complaint about unfinished work.

Give the correct time to respond and say that court proceedings may follow. There is no single 14-day deadline for every letter. The relevant protocol may require a longer period and additional documents.

PRACTICAL CHECKS

  • Briefly explain the agreement or legal duty and what went wrong.
  • Show how the amount is calculated.
  • Use the deadline required for that claim type.

PRE-ACTION STEP 08

Is going to court really the next step?

You may be able to agree payment or another solution without a court decision. This is called alternative dispute resolution, or ADR. It includes direct discussions and mediation, where an independent person helps both sides discuss an agreement.

Fictional example: A customer offers £1,500 to settle a £1,800 dispute. Before accepting, record whether that amount settles the whole claim, including any interest or fees, and when it must be paid. Do not leave the meaning of the offer unclear.

If court is still needed, check the defendant’s details, time limit, evidence, fees and pre-action steps. Also consider whether the defendant has money or assets. Winning a claim does not guarantee payment.

PRACTICAL CHECKS

  • Consider a reasonable settlement or payment plan.
  • Check whether the proposed defendant can pay.
  • Check the complete file before sending the claim to the court.

The steps before court depend on the parties and the type of claim. This guide gives general information for England and Wales. It does not decide what should be done in an individual case.

EVIDENCE & PROOF

What Evidence Do You Need for a Small Claim?

In an ordinary civil dispute, the judge usually asks: is this fact more likely to be true than not? This is called the balance of probabilities. A person relying on a disputed fact normally has to prove it.

Evidence helps answer that question. A short timeline and relevant records can explain your case more clearly than a large folder with no explanation of what each item shows.

EVIDENCE TYPE 01

Agreements and the work included

The quotation, work order, terms and messages can show what work and price were agreed. A later agreed change is called a variation. An unsigned document can still matter if the parties acted on its terms.

Fictional example: A quote includes painting three rooms. A later message approves a fourth room for £300. Keep both documents: one shows the original job and the other helps show the agreed extra.

A document showing what was agreed does not, on its own, prove that the work was completed.

WHY THIS EVIDENCE MATTERS

  • Shows what was agreed.

EVIDENCE TYPE 02

Invoices, payments and materials

An invoice records what someone is asking to be paid. It does not, by itself, prove that the whole amount is owed. Use the agreement, payment records and other evidence to explain the figures.

Fictional example: A £2,400 job less a £600 deposit leaves a starting balance of £1,800. The quotation supports the price; the bank record supports the deposit. Any extra work, credit or disputed deduction needs its own explanation.

Keep receipts and supplier records where they help explain a cost. Show the calculation clearly, including the basis of any interest or fee.

WHY THIS EVIDENCE MATTERS

  • Supports the figures.

EVIDENCE TYPE 03

Emails, messages and instructions

Messages can show instructions, agreed prices, complaints and offers to return. Save the whole conversation, including dates, names and attachments.

Fictional example: “Go ahead” could approve a £300 extra, a free correction or an inspection. The earlier messages show which one was meant. An isolated screenshot may leave that important point unclear.

WHY THIS EVIDENCE MATTERS

  • Shows what the parties said and did.

EVIDENCE TYPE 04

Photographs and videos

Photographs and videos can show the condition of work or property. Keep the original files and note when, where and by whom they were taken.

Fictional example: A photograph shows a wet ceiling after a boiler repair. It helps establish the damage, but it does not necessarily show whether the boiler repair caused the leak. Earlier photographs, inspection findings and the timing of events may help answer that separate question.

WHY THIS EVIDENCE MATTERS

  • Records visible condition and changes.

EVIDENCE TYPE 05

Witnesses and site records

A witness explains what they personally saw, heard or did. A witness statement is their written account for the court. It should identify the relevant events and documents, and use the required statement of truth when signed.

Fictional example: An installer can describe fitting a pipe and testing it. They should not claim to know what another contractor did afterwards unless they witnessed it or clearly identify the source of that information.

Job sheets, diaries and attendance records can help the witness give dates and explain the order of events.

WHY THIS EVIDENCE MATTERS

  • Provides a chronology and direct observations.

EVIDENCE TYPE 06

Technical reports and expert evidence

An expert uses specialist knowledge to give an opinion, such as why a heating system failed. This is different from a witness describing something they personally saw.

Court permission is required for expert evidence, written or spoken, at a small-claims hearing. Check the court’s instructions before arranging a report for that purpose.

Fictional example: A £900 repair quotation may help show the proposed cost of putting work right. It does not automatically prove who caused the fault, and it is not automatically an independent expert report.

WHY THIS EVIDENCE MATTERS

  • Helps explain technical problems and reasonable repair costs.

How a Judge Decides What the Evidence Shows

The judge considers whether the disputed facts are more likely to be true than not. They look at the reliability, consistency and context of the evidence.

Fictional example: Twenty payment reminders show that a bill was chased. They do not necessarily prove that an extra £500 was agreed. A complete message conversation approving that extra may be more useful on that particular issue.

Small-claims hearings use simpler procedures, but court instructions still matter. Standard directions usually require the documents you will rely on to reach the court and the other side at least 14 days before the hearing. Follow your court order if it sets a different requirement. Expert evidence at the hearing needs court permission.

CPR Part 27

Quick help with court stages

Use these short explanations when you receive a court notice. The detailed process guide follows below. Always follow the dates and instructions for your own case.

Directions Questionnaire: what it is for

A Directions Questionnaire gives the court information needed to manage a defended claim, such as witnesses, availability and hearing arrangements. Form N180 is commonly used for proposed small claims, but an online claim may ask for the information online. Check which form or task the court has actually sent, the deadline, and who must receive a copy. It is not a witness statement or a substitute for a Defence.

Follow the questionnaire step in Making a Small Claim or Defending a Small Claim, and use the official N180 form and guidance.

Small claims mediation

For a disputed money claim of £10,000 or less, the court will normally require free mediation. Check the notice for your case. The appointment is usually by telephone and can last up to an hour. The mediator helps the parties explore agreement and does not decide the case. Prepare your figures, the points you need to resolve and any terms you could accept. A settlement can be binding; missing a required appointment can lead to sanctions.

Read the current GOV.UK mediation guidance.

Court directions and evidence deadlines

Directions are the court’s instructions for preparing the case. Make a checklist of every task, deadline and recipient. “File” means send to the court; “serve” means send to another party. The standard small-claims directions usually require copies of the documents relied on at least 14 days before the hearing, but your court order may specify a different timetable. Keep proof of sending, and raise any difficulty promptly rather than missing the date silently.

Use the evidence and proof section and check CPR Part 27. Expert evidence needs the court’s permission.

Quick questions about building and repair claims

Is every claim under £10,000 a small claim? No. Value matters, but the court also considers the type and complexity of the case, and some claims have different limits.

Is a Letter Before Action a court claim? No. It is a pre-action demand. An issued claim comes with court information and a response deadline that must be dealt with separately.

Can I present my own case? Yes. Many people do, but they must still meet deadlines and prove their position with relevant evidence.

Does TDD cover every dispute described here? No. The law guide is general information. TDD’s standard fixed-price claim and defence services are for eligible contractual money disputes; negligence-only claims are excluded. Technical support is assessed and quoted separately. Check the service terms and the relevant service page.

RUNNING A SMALL CLAIM

Small Claims: From Starting a Claim to the Court’s Decision

The small claims track is a simpler procedure within the County Court. It is commonly used for straightforward money disputes. The steps below explain starting a claim, responding to it and what happens after the judge’s decision. Follow the dates and instructions in your own court papers.

SMALL CLAIMS STAGE 01

Starting the claim

To start a claim, identify the correct claimant and defendant, explain the claim and state the amount or other outcome sought. Pay the court fee, unless help with the fee applies.

Particulars of Claim means the explanation of your case: what agreement or duty you rely on, what went wrong and how you worked out the amount.

Fictional example: For a £1,800 decorating balance, explain the £2,400 agreement, the £600 payment and why you say the work was completed and the balance is due. The invoice alone does not answer every possible dispute.

Many money claims can be started online; others need paper Form N1 or another route. Check the official instructions and complete the relevant pre-action steps first.

PRACTICAL CHECKS AT THIS STAGE

  • Identify the correct claimant and defendant.
  • Check the amount, your explanation of the claim and the court fee.
  • Complete the steps required before starting a claim.

SMALL CLAIMS STAGE 02

The defendant’s response

The defendant may pay, admit all or part of the claim, dispute it, or take another response step allowed by the court process. Read the claim papers immediately and use the stated response route.

Service means formally delivering court documents in the way the rules allow. In an ordinary Part 7 claim, the usual defence deadline is 14 days after service of the Particulars of Claim. An acknowledgment of service filed on time can extend this to 28 days from that service date. This acknowledgment tells the court the claim has been received; it is not the defence itself.

Online procedures and other situations can have different arrangements. Follow the notice for your claim. If the defendant does not respond, the claimant may be able to request default judgment: a decision without a contested hearing. The conditions must be met; it is not an automatic win when the deadline passes.

PRACTICAL CHECKS AT THIS STAGE

  • Read the notice of claim and its stated deadline.
  • Choose the response allowed for your claim and check its deadline.
  • Do not ignore served court papers.

SMALL CLAIMS STAGE 03

Answering a claim and bringing a claim back

A Defence is the defendant’s formal explanation of why all or part of the claim is disputed. Answer the specific allegations. State what is accepted, what is denied and why, and what cannot be confirmed.

Fictional example: A customer claims £1,500 for floor damage after a carpenter’s visit. The carpenter accepts working in the room but says the damage was already present. A useful response explains that position and identifies the dated photographs. Saying only “I owe nothing” leaves the reason unclear.

A counterclaim is a separate claim made by the defendant against the claimant. It needs its own facts, legal basis and calculation, and can require a court fee. A complaint or deduction is not automatically a valid counterclaim.

PRACTICAL CHECKS AT THIS STAGE

  • Respond to the claim’s specific allegations.
  • Explain each claimed defect or deduction and the evidence for it.
  • Check whether a counterclaim requires a fee.

SMALL CLAIMS STAGE 04

The questionnaire and the court’s choice of process

A Directions Questionnaire asks for practical details such as witnesses, unavailable dates and hearing needs. The court may use Form N180 or online questions.

The court then chooses a procedure, called a track. This choice is called allocation. Most straightforward money claims worth no more than £10,000 normally use the small claims track, but there are exceptions. The court also considers the type and complexity of the case.

Fictional example: If you will give evidence yourself, include yourself when answering the question about witnesses. Do not count someone merely because they have helped organise your papers.

Return the questionnaire as instructed and read the court’s next order carefully.

PRACTICAL CHECKS AT THIS STAGE

  • Complete any Directions Questionnaire on time.
  • Identify witnesses and practical hearing requirements.
  • Read the court’s choice of procedure and its instructions carefully.

SMALL CLAIMS STAGE 05

Mediation and settlement

Mediation is a discussion with an independent person who helps both sides try to agree a solution. The mediator does not decide who is right. Court-organised small-claims mediation is free and usually uses separate telephone conversations, in an appointment lasting up to an hour.

For many disputed money claims of £10,000 or less, attendance is required. Follow your notice and take part properly. Missing a compulsory appointment can lead to consequences such as a costs order.

You decide whether to accept a settlement. An agreement reached at the appointment is legally binding, so check the amount, payment dates and what it settles before agreeing. If no agreement is reached, the claim continues through the court process.

PRACTICAL CHECKS AT THIS STAGE

  • Take part in mediation when the court requires it.
  • Consider a realistic settlement proposal.
  • Keep any agreed terms in writing.

SMALL CLAIMS STAGE 06

The court’s instructions and your evidence

Directions are the court’s instructions about what to do and by when. They tell you which documents to provide and whether witness statements are required.

  • File: send the document to the court in the required way.
  • Serve: give it to the other party in the required way.
  • Witness statement: a witness’s written account of relevant events.
  • Bundle: the organised collection of documents required for the hearing.

Standard small-claims directions usually require documents at least 14 days before the hearing, but your court order may set different requirements. Record each deadline and keep proof of sending.

Use the quote, messages, photographs and payment records to support particular points. Court permission is required for expert evidence at the hearing.

PRACTICAL CHECKS AT THIS STAGE

  • Read every court order and calendar the deadlines.
  • Give the required documents to the court and the other side as instructed.
  • Get court permission before using expert evidence at the hearing.

SMALL CLAIMS STAGE 07

Hearing, judgment and costs

At the hearing, the judge considers the disputed facts, the evidence and the law. A small-claims hearing is usually less formal than a larger trial, but both sides must follow the judge’s instructions.

Be ready to explain what was agreed, what happened and how the amount was calculated. When referring to a document, help the judge find the relevant page.

A judgment is the court’s decision. It may include an order to pay money. The judge will explain the reasons.

The winning side cannot normally recover all its legal fees on the small claims track. Court fees and some allowed expenses may be recoverable. Unreasonable conduct can lead to additional costs. Check exactly what the order requires.

PRACTICAL CHECKS AT THIS STAGE

  • Prepare a clear timeline of the events that are disputed.
  • Explain your evidence and claim calculations.
  • Follow the judge’s instructions at the hearing.

SMALL CLAIMS STAGE 08

Payment and Collecting an Unpaid Judgment

If a judgment orders payment, read the amount and payment deadline carefully. The debtor owes the money; the creditor is entitled to receive it.

If payment is not made, enforcement means asking the court to take a further step to recover it. Depending on the debtor’s circumstances, options may include:

  • A warrant of control: asking bailiffs to collect payment or take eligible goods for sale.
  • An attachment of earnings order: arranging deductions from an employed individual’s wages.
  • A third-party debt order: seeking money held for the debtor, for example in a bank account.
  • A charging order: securing the debt against certain assets, such as a property. This does not itself produce immediate payment.

Each route has conditions and may involve another application and fee. Check which fits the debtor’s income or assets. A judgment does not create money where none is available.

PRACTICAL CHECKS AT THIS STAGE

  • Check what the judgment requires and when payment is due.
  • Check which collection method fits the debtor’s income or assets.
  • Remember that collection often requires a separate application and fee.

Throughout your case: keep the claim number and court notices, record every deadline, send documents as instructed and consider reasonable ways to settle.

Making a money claim · mediation · CPR Part 27 · case law about court procedure · practical small-claims scenarios

TRADES DISPUTE EXAMPLES

How the Law Applies to Everyday Trades Disputes

These sixteen fictional examples show how legal rules can affect real kinds of trades dispute. Each explains the facts that matter, the reason they matter and useful evidence.

They are teaching examples, not customer case studies or promises about how a court will decide your case. Different facts or contract terms can change the result.

Find an Example by Legal Issue

Agreements, Extra Work and Consumer Rights

These examples explain agreed prices, extra work, defects and consumer rights. Related court decisions cover making a contract, defective work and rights given by legislation.

Fictional situation: A customer offers £5,000 for a wall with an agreed size and specification. The builder reads the terms and starts the work without objecting to the price. Nobody signs. After finishing, the builder demands £10,000 because the paperwork was unsigned.

The rule: agreement can be shown by actions as well as signatures. Starting the specified work after receiving the offer can show acceptance.

How it helps: these facts support the customer’s argument that the agreed price was £5,000. The absence of a signature does not, on its own, justify another £5,000.

What could change the answer? A clear agreement that no contract would exist until signing, a different agreed price or authorised extra work could matter.

Evidence: the proposed terms, replies, work records and any agreed changes.

Read about making a contract.

Fictional situation: A plumber’s accepted quote covers one bathroom. During the job, the customer asks for an extra outside tap. The plumber messages, ‘The extra tap and pipework will cost £300.’ The customer replies, ‘Agreed, please add it.’

The rule: a change to the work is called a variation. The extra work, price and approval must be established, and any required method of approving changes must be followed.

How it helps: if the exchange meets the contract’s requirements, it supports a £300 extra charge. The original quote shows why the tap was outside the original job.

What could change the answer? If the tap was already included, or a required approval was missing, the claim needs a different explanation. With no agreed extra price, the trader must establish any right to a reasonable payment.

Evidence: the original quote, the full message thread and the contract’s rules for changes.

Read about changes and contract terms.

Fictional situation: A homeowner holds back a £4,800 refurbishment balance. They identify a few finishing defects and obtain a £6,000 quote to replace much of the work.

The rule: genuine defects can justify a remedy, but the claimed amount must have a proper basis. A replacement quote does not prove that every quoted item is necessary.

How it helps: if the proven problem is a small area needing repainting, the customer must explain why wider replacement is needed. If serious defects make the whole installation unusable, more extensive work may be justified.

What else matters? Consumer correction and price-reduction rights, reasonable repair costs and any relevant opportunity to put the work right must be considered. Neither side should assume the whole bill disappears or remains fully payable without examining the problem.

Evidence: the specification, photographs, itemised repair estimates and communications about inspection or correction.

Read about defective work and remedies.

Fictional situation: A homeowner agrees at home to pay £4,000 for bathroom-fitting labour, using fittings they supply. This is an ordinary planned job, not an urgent repair. The fitter gives the required information about cancellation and payment for an early start. The homeowner emails a request to start early, work starts on day two, and the homeowner cancels on day eight before completion.

The rule: where the normal cooling-off rules apply, starting early does not automatically remove the cancellation right. Properly requested services already supplied can require proportionate payment.

How it helps: the fitter should explain the work supplied and the amount properly due under those rules. They cannot simply treat the full £4,000 as payable because work started.

What could change the answer? Missing required information or a valid early-start request can prevent payment for services supplied during the cancellation period. Full completion has separate conditions for ending the cancellation right.

Evidence: the contract date, cancellation information, early-start request, work records and cancellation message.

Read the consumer-rights section and related court decisions.

Agency and Subcontractors

These examples explain permission to order work and why missing a construction-payment notice can change what must be paid now. Related court decisions cover agents and construction contracts.

Fictional situation: A landlord emails a plumber saying that the property manager can order routine repairs on the landlord’s behalf. The manager orders a routine £650 repair. The landlord later refuses payment because the manager exceeded a private £300 limit, which the plumber did not know about.

The rule: a principal’s words or actions can create apparent authority if the contractor reasonably relies on them. This is different from the permission the agent actually had.

How it helps: the landlord’s email may support the plumber’s claim that the manager appeared authorised to make this agreement. The wording and whether reliance was reasonable matter.

What could change the answer? The plumber knowing about the limit, a major job outside routine repairs, or the manager merely claiming permission without support from the landlord could weaken that argument.

Evidence: the landlord’s email, the order, the accepted terms and any earlier dealings known to the plumber.

Read about authority and contracting parties.

Fictional situation: Under a construction contract covered by the special legal payment rules, a valid payment notice fixes a stage payment at £5,000. The main contractor thinks the work is worth £3,000 but does not give a valid notice reducing the payment by the required deadline.

The rule: the notice system can decide the amount payable by the final payment date. The amount identified under those rules is called the notified sum.

How it helps: the main contractor will normally have to pay the £5,000 now. A later process about the work’s true value can still change the amount finally owed. Missing the notice does not necessarily mean the subcontractor has proved the work was worth £5,000 forever.

What could change the answer? The contract must be covered by the rules, and the notice and dates must be valid. An ordinary invoice does not automatically meet every notice requirement.

Evidence: the contract, application, payment notices, delivery records and payment timetable.

Read the construction-contract section and related court decisions.

Negligence, Damage and Building Safety

Who caused the damage, which safety rules apply and what the evidence shows. These are separate questions, even when they arise on the same job.

negligence and safety

Fictional example: A roof leaks after a scaffolding firm and a roofer have worked on it. A photograph taken before either firm arrived already shows a broken tile.

How the rule works: The date the leak was noticed does not identify who caused it. The owner needs to show what a particular contractor did wrong and how that caused the damage.

What could change the answer? Evidence of fresh damage where a scaffold rested could support a claim against the scaffolding firm. Evidence that the roofer left a new opening could point elsewhere. The earlier broken tile must also be considered.

Useful evidence: Before-and-after photos, records of who worked where, messages about the leak and, where needed, a technical report. Court permission is required to use expert evidence at a small claims hearing.

Read about Negligence and proof

Fictional example: A property company orders a replacement gas boiler. It heats the building, but the installer was not authorised to carry out that gas work and required records are missing.

How the rule works: A working boiler does not prove that the installation met gas-safety and building-control requirements. The business, engineer’s qualifications and type of gas work must meet the rules that apply.

Why this matters: Safety or registration failures can have consequences even when the invoice has been paid. A claim for money still needs its own basis: explain the broken promise or legal duty and the cost or loss it caused.

Useful evidence: The quotation, installer details, relevant registration checks, installation records and any inspection findings.

Read the relevant law section · related judgments

Fictional example: A roofing firm sends workers onto a fragile roof with unsuitable access equipment. Nobody falls.

How the rule works: Work-at-height rules aim to prevent falls. The contractor must plan the job and use suitable precautions. An accident does not have to happen before unsafe methods can break the rules.

Why this matters: Completing the roof or receiving payment does not remove safety duties. A separate claim for compensation would still need evidence of a legal wrong and a loss for which compensation is available.

Read the relevant law section · related judgments

Fictional example: During a refurbishment, a builder finds old insulation that may contain asbestos. On a different part of the job, the builder arranges removal of ordinary rubble.

Asbestos point: Arrange the appropriate assessment before work that could disturb the suspect material. The material and type of work determine the precautions, training and any licence needed. Do not treat suspect insulation as ordinary rubble.

Waste point: The person or business carrying waste may need waste-carrier registration. The registration is not simply a registration of the van. Check the carrier, the disposal destination and the required transfer records.

Why this matters: Asbestos controls and waste-disposal rules are separate duties. A quote saying “remove rubbish” does not remove either duty.

Read the relevant law section · related judgments

Fictional example: A customer photographs a paint stain on a carpet after decorating work. The decorator says the stain was already there.

What the photo proves: It shows the carpet’s condition when the photo was taken. By itself, it may not show when the stain appeared or who caused it.

What would help? A dated photo before work, a job-sheet note about existing marks, or a message sent when paint was spilled could help settle the disputed point.

The lesson: Match each piece of evidence to the fact you need to prove. Keep original files and full message threads so their dates and context can be checked.

Read the relevant law section · related judgments

Payment, Money Held Back and Business Risk

When a final bill is due, what can be added to a late business payment, and what happens if the customer’s company cannot pay.

defective work · construction contracts

Fictional example: A subcontract price is £4,000. The agreement allows 5% to be held until a stated release date. The customer pays £3,800 and keeps £200.

How the rule works: The £200 is a retention: money held back under agreed terms. If the agreed release condition has not yet been met, that money may not be due. Once the condition is met, the customer needs a proper basis to keep it.

What could change the answer? A proven claim for defects may affect the balance. For contracts covered by construction-payment law, payment notices can also determine what must be paid now.

Useful evidence: The retention clause, completion records, the release date, any defect details and the payment notices. List each amount separately before claiming the balance.

Read about Before Court steps

Fictional example: A letting agency orders a £600 repair in its own company name and agrees that it will pay. The invoice is a business debt covered by the commercial late-payment rules. It is paid six months late.

How the rule works: The supplier may be entitled to interest allowed by the late-payment law and £40 fixed recovery compensation. The £40 is not a new charge for each month or reminder.

What could change the answer? First establish who contracted to pay. An agent acting only for a landlord may not itself owe the invoice. The commercial rules also do not automatically apply to an ordinary homeowner’s consumer debt.

Useful evidence: The order naming the customer, agreed payment terms, invoice due date and actual payment date.

Read the relevant law section · related judgments

Fictional example: A subcontractor is owed £7,000 by a limited company. The company enters liquidation, a process for winding up its affairs. Its director owns another profitable business.

How the rule works: The customer company is normally responsible for its own debt. The director and the other company do not automatically become responsible because they have money.

What could change the answer? An enforceable personal guarantee—a separate promise by the director to pay the company’s debt—could provide another claim. Other claims need their own legal basis and evidence.

Practical point: Check how to submit the debt to the liquidator, the person handling the winding-up. Recovery depends on the company’s assets and insolvency rules; a court judgment does not guarantee payment.

Read the relevant law section · related judgments

Before Court and the Small Claims Process

Naming the correct person or company, following the steps before court and meeting court deadlines.

court procedure

Fictional example: A contractor brings a £3,500 invoice claim without a solicitor. The court orders both sides to exchange documents by a stated date. The contractor misses it.

How the rule works: The small claims process is simpler, but court instructions still apply. A strong invoice claim does not give permission to ignore a deadline. The court decides what effect the failure has, including whether late material can be used.

Practical point: Record each deadline as soon as the order arrives. If you cannot comply, act promptly and follow the proper process for asking the court to change the requirement. Do not assume silence or an informal request extends the deadline.

Read the relevant law section · related judgments

Fictional example: A roofer receives an order clearly made by an authorised agent on behalf of a named landlord. The roofer later threatens to sue the agency and allows seven days to reply.

First question: who owes the bill? If the landlord is the contracting customer and the agency made no separate payment promise, the claim would normally be against the landlord. Check the order and the agent’s authority.

Second question: which steps come before court? A construction dispute may have its own pre-action protocol—a set of steps to follow before issuing a claim. The Debt Claims Protocol generally covers business debts pursued against individuals, including sole traders, unless another protocol applies.

The lesson: A generic seven-day demand may be inadequate. Identify the customer first, then use the correct letter, supporting information and response period for that type of dispute.

Before Court · Agency & Authority · related court decisions

What These Examples Have in Common

For every dispute, ask four questions: What was agreed or required by law? What went wrong? What proves it? What result does the law allow?

Show your calculation if you are asking for money. Explain the disputed facts if you are answering a claim. Strong feelings alone cannot prove either side’s case.

Before Court · Evidence & Proof · Running a Small Claim · Case Law & Precedent

REAL COURT DECISIONS AND THE RULES THEY EXPLAIN

Trades Dispute Case Law: Real Court Judgments

A judgment is a court’s decision and its reasons. These real cases explain how judges apply legal rules to particular facts. They can help you understand an argument, but they cannot predict the result of your own dispute.

How Can an Earlier Case Affect Yours?

Courts use both legislation—laws passed by Parliament—and rules developed in earlier court decisions.

A legal rule established by a higher court may have to be followed by a lower court. This is called binding precedent. The rule must be relevant to the later dispute.

The key rule needed to decide the earlier case is sometimes called the ratio decidendi. You do not need to use that Latin phrase. Ask: “What legal reason led the court to this result, and does that reason fit my facts?”

Why an Earlier Win Doesn’t Guarantee Yours

Two cases can look similar but turn on different facts. For example, a few repairable defects are different from a heating system that fails to heat the house properly.

A judge may explain why an earlier case does not decide the new dispute. Lawyers call this distinguishing the earlier case. Later laws or decisions can also change how an older case applies.

Most decisions below concern civil disputes. R v Chargot is a criminal health-and-safety case and is labelled separately. It explains a safety duty, not who wins an ordinary unpaid-invoice claim.

18 Real Judgments, Organised by Legal Topic

Choose a topic and open a case. Each summary explains what happened, what the court decided and why the point matters in a trades dispute.

Making Agreements, Changing Terms and Extra Payment

How an agreement becomes binding, how its terms can change and when a promise of extra payment can be enforced.

UNSIGNED CONTRACTS · UK Supreme Court · [2010] UKSC 14

What happened: A supplier started installing machinery while the parties were still discussing their final contract. Work continued after their temporary agreement expired. They never signed the final document.

What the court decided: The Supreme Court found that a binding agreement existed. The parties’ words and actions showed what they had agreed. On these facts, they had given up the original requirement for a signed contract.

The rule in plain English: A signature is not always needed. The court looks at what both sides said and did, and whether the important terms were agreed.

Why it matters for trades: A quote, an acceptance message and starting the agreed work can help prove a contract. But starting work does not automatically accept every term in an unsigned document. Keep the complete exchange of messages and any condition requiring a signature.

Read the judgment or official case record

ORAL VARIATIONS · UK Supreme Court · [2018] UKSC 24

What happened: An office agreement said changes had to be written down and signed. The occupier relied on a telephone agreement to change its payment dates.

What the court decided: The Supreme Court held that the telephone change was not effective because it did not meet the agreed writing and signature requirements.

The rule in plain English: A contract can set rules for changing its terms. A later conversation does not normally remove those rules. Narrow exceptions can arise, but the conversation alone is not enough.

Why it matters for trades: Before agreeing extra work, check how your contract requires changes to be approved. Record the extra work, price and approval in the required form. A casual phone call may not protect you when the contract requires a signed change.

Read the judgment or official case record

EXTRA PAYMENTS · Court of Appeal · [1989] EWCA Civ 5

What happened: A carpentry subcontractor was struggling to finish. The main contractor promised extra money to help keep the job on schedule and avoid finding a replacement.

What the court decided: The Court of Appeal upheld the extra-payment agreement. Keeping the work moving gave the main contractor a real practical benefit. There was no finding of improper pressure or fraud.

The rule in plain English: A promise to pay more can sometimes be binding even where the subcontractor is already required to finish. The practical benefit can be the value exchanged, which lawyers call consideration.

Why it matters for trades: A genuine agreed change is different from adding money to the bill after finishing. Record why extra payment was agreed and follow any contract rules for changes. This case does not give a contractor a right to force an increase by improper pressure.

Read the judgment or official case record

Faulty Work, Compensation and Promised Specifications

Why the seriousness of a defect matters, how compensation is assessed and why the promised specification must be checked.

MINOR DEFECTS · Court of Appeal · [1952] EWCA Civ 6

What happened: A contractor decorated and furnished a flat for an agreed total price. Some items needed correction. The customer refused to pay the remaining £350.

What the court decided: The Court of Appeal allowed the contractor to recover the balance, less about £56 to put the defects right. The job had been substantially performed: the contractor had done the main agreed work despite the defects.

The rule in plain English: Some defects may justify a reasonable deduction instead of removing the right to all payment. The contract and the nature of the defects matter.

Why it matters for trades: Separate each alleged defect from the rest of the completed job. Explain the reasonable cost of correcting it. Do not assume every snag excuses the whole bill, or that this older case overrides today’s consumer rights.

Read the judgment or official case record

SERIOUS DEFECTS · Court of Appeal · [1972] EWCA Civ 5

What happened: A contractor installed a central heating system. It did not heat the house adequately and released fumes into living rooms. Significant work was needed to fix it.

What the court decided: The Court of Appeal found that the main purpose of the job had not been achieved. The contractor could not recover the agreed lump-sum price on the basis of substantial performance.

The rule in plain English: A job with serious failures can be different from one with minor finishing defects. The court looks at what the defects do to the usefulness of the work, as well as their repair cost.

Why it matters for trades: Compare this with Hoenig v Isaacs above. A loose cupboard handle and a heating system that cannot safely heat a house raise different arguments. Explain the practical effect of each defect, rather than only counting the defects.

Read the judgment or official case record

REASONABLE REPAIR COSTS · House of Lords · [1995] UKHL 8

What happened: A swimming pool was shallower than agreed, but remained usable and had not lost market value. The owner sought £21,560 to demolish and rebuild it.

What the court decided: The House of Lords refused that rebuilding cost because it was out of proportion to the benefit. It restored a £2,500 award for the lost enjoyment of the pool as promised.

The rule in plain English: Compensation must address the loss reasonably. A departure from the specification does not automatically make the most expensive repair proposal recoverable.

Why it matters for trades: A quote to replace an entire bathroom does not itself prove that full replacement is necessary. Explain why the proposed work is needed and whether a smaller repair would reasonably solve the problem. The contract, evidence and any consumer rights still matter.

Read the judgment or official case record

WHICH LOST PROFITS CAN BE CLAIMED? · Court of Exchequer · [1854] EWHC Exch J70

What happened: A carrier delayed delivery of a broken mill shaft. The mill owners claimed the profits lost while the mill was stopped. The carrier did not know the special circumstances needed to expect that loss.

What the court decided: The court ordered a new trial. On those facts, the lost profits should not have been included in the compensation.

The rule in plain English: Contract compensation normally covers losses that arise naturally from the breach, or that both sides could reasonably have expected when making the agreement. This limit is called remoteness.

Why it matters for trades: A claim for lost rent or trading income needs more than a total figure. Explain how the breach caused that loss and why this kind of loss was reasonably foreseeable when the contract was made. Evidence that a special risk was explained in advance may matter.

Read the judgment or official case record

TECHNICAL SPECIFICATIONS · UK Supreme Court · [2017] UKSC 59

What happened: Offshore wind-farm foundations failed. The contractor had followed a named design standard, but its contract also required foundations designed for a 20-year lifetime.

What the court decided: The Supreme Court held that meeting the named standard did not remove the separate 20-year design requirement. The design failed that requirement too.

The rule in plain English: A contract can require more than the usual industry standard. Its documents must be read together to work out exactly what was promised.

Why it matters for trades: Check the quote, drawings and specification before promising a particular result. Showing that you used a recognised method may not answer a claim that you failed to deliver an additional result expressly required by the contract.

Read the judgment or official case record

Agents and Who Agreed to Pay

Why the person placing an order and the person legally responsible for paying may be different.

[2025] EWCA Civ 876 · AGENCY & UNDISCLOSED PRINCIPALS

What happened: A shipping company tried to hold exporters responsible for promises made by an intermediary that had become insolvent. It argued that the intermediary had secretly acted as the exporters’ agent.

What the court decided: The Court of Appeal dismissed the appeal. At that stage, the claimants had not shown enough to allow the claim against the exporters to proceed on that basis.

The rule in plain English: An undisclosed principal is someone for whom an agent acts without revealing that it is acting for another person. This argument needs evidence of actual authority and an intention to act for that person. A business connection or benefit is not enough.

Why it matters for trades: A landlord benefiting from a repair does not, by itself, prove that the landlord agreed to pay your business. Check the order, the agent’s authority and who the contract binds. Other agency rules may apply where the agency relationship was openly disclosed.

Read the court judgment or official case record

Subcontractors, Payment Notices and Quick Dispute Decisions

Rules about construction payments, quick decisions by adjudicators, promises to building users and companies that cannot pay.

[2018] EWCA Civ 2448 · CONSTRUCTION PAYMENT NOTICES

What happened: A hotel-building contractor and its customer disputed a payment application and the notices used to reduce payment. They also disagreed about whether the work’s value could be assessed separately.

What the court decided: The Court of Appeal upheld the relevant notices. It confirmed that a payer can seek a decision on the true value after first making any payment required by the notice rules.

The rule in plain English: For construction contracts covered by these rules, a valid notice process can fix what must be paid now. The amount fixed by those notice rules is called the notified sum. A pay-less notice gives the amount the payer says is due and how it was calculated.

Why it matters for trades: Check the correct notice, amount and deadline. Missing a required notice can affect immediate payment even if the work’s value is disputed. It does not automatically settle the final value, and these rules do not cover every homeowner contract.

Read the court judgment or official case record

[2020] UKSC 25 · SUBCONTRACTS & INSOLVENCY

What happened: An electrical subcontractor entered liquidation after financial failure. It and the main contractor each said the other owed money. The main contractor tried to stop adjudication.

What the court decided: The Supreme Court held that the company’s statutory right to adjudicate had not disappeared because it was in liquidation.

The rule in plain English: Adjudication is a process in which an independent person gives a quick decision on a construction dispute. The decision is normally binding until the dispute is finally settled by agreement, a court or arbitration. Insolvency rules can still require debts each side owes to be balanced against each other.

Why it matters for trades: A failed company may still have a right to ask an adjudicator to decide a dispute. Whether the resulting payment can be enforced or recovered is a separate question. Do not treat the right to a decision as a guarantee of receiving money.

Read the court judgment or official case record

[2024] UKSC 23 · THIRD-PARTY RIGHTS & CONSTRUCTION WARRANTIES

What happened: A contractor gave a care-home tenant an additional written promise about its building work. The tenant sought a quick decision from an independent adjudicator under construction-payment law about alleged fire-safety defects.

What the court decided: The Supreme Court held that this promise was not itself a construction contract giving that statutory right. It mainly repeated obligations already owed under the building contract.

The rule in plain English: A collateral warranty is an additional promise to someone outside the main contract, such as a tenant. It can create rights, but it does not automatically create a right to construction adjudication. Its wording and any separate promise to carry out construction work matter.

Why it matters for trades: Read what the warranty actually promises and which dispute process is available. Having a warranty and having a statutory right to adjudicate are different questions.

Read the court judgment or official case record

Damage Claims and Building-Safety Duties

Who can be responsible for unsafe building work, and why workplace-safety duties apply separately from payment disputes.

[2025] UKSC 21 · NEGLIGENCE & BUILDING SAFETY

What happened: A developer discovered serious structural design defects after selling the buildings. It paid to make them safe and sought the costs from its engineering designer.

What the court decided: The Supreme Court rejected the designer’s appeal. Repair costs were not automatically excluded simply because the developer no longer owned the buildings or had acted without an enforceable demand to repair them. The court also considered separate building-safety duties and claims to share responsibility.

The rule in plain English: Reasonable work to put dangerous defects right can lead to a claim against the responsible designer. The claimant still needs to establish the legal duty, the failure, the link to the loss and the recoverable amount.

Why it matters for trades: Taking action to address a serious defect before an accident does not necessarily defeat a later claim. Keep inspection evidence, the reasons for the work and the cost records. These claims can be much more complex than an unpaid invoice.

Read the court judgment or official case record

[2008] UKHL 73 · CRIMINAL HEALTH-AND-SAFETY CASE

What happened: A worker was trapped when a dumper truck overturned and died the next day. Companies and a director appealed against criminal health-and-safety convictions.

What the court decided: The House of Lords dismissed the appeals and explained the duties to protect workers and others from workplace risks.

The rule in plain English: Safety duties exist under the law, separately from the customer’s contract. They concern risks and the precautions required to control them. They are not satisfied merely because the building work was completed.

Why it matters for trades: Training, safe equipment and planning can matter even when there is no invoice dispute. This was a criminal safety case, not a small claim. It does not by itself decide whether a customer can withhold payment or recover a particular repair bill.

Read the court judgment or official case record

Read the House of Lords judgment on Parliament’s website.

Consumer Terms and Rights at Work

How the real working arrangement and consumer-protection rules can affect rights, despite the labels or charges in a contract.

[2011] UKSC 41 · EMPLOYMENT STATUS & SELF-EMPLOYMENT

What happened: Car valeters signed documents describing them as self-employed contractors. The way they actually worked did not match all the written terms. They claimed rights given by law to workers.

What the court decided: The Supreme Court upheld the finding that they had worker status for the protections at issue.

The rule in plain English: The label in a contract is not the whole answer. Where employment-rights rules apply, the court can examine the real agreement and how the relationship worked in practice.

Why it matters for trades: Calling an installer a “subcontractor” does not automatically settle their employment rights. Who controls the work and what the person must actually do can matter. This does not mean every self-employed tradesperson is an employee; the applicable legal test and facts must be checked.

Read the court judgment or official case record

[2015] UKSC 67 · PENALTY CLAUSES & CONSUMER FAIRNESS

What happened: A motorist challenged an £85 parking charge. He argued that it was an unlawful penalty and an unfair consumer term.

What the court decided: The Supreme Court upheld the charge on the particular facts. It protected a legitimate interest in managing parking and was not treated as an unlawful penalty or unfair term.

The rule in plain English: A payment triggered by breaking a contract is not automatically invalid just because it exceeds the immediate financial loss. The reason for the charge and whether it is out of proportion can matter. Consumer fairness rules must also be considered.

Why it matters for trades: Do not assume a large delay or cancellation charge is valid because it appears in writing—or invalid only because it exceeds direct costs. Check what triggers it, what it protects and which rules apply. This parking decision does not approve every charge in a building contract.

Read the court judgment or official case record

Trying to Settle and Following Court Rules

Why courts can require attempts to settle, and why people without solicitors still need to follow court instructions.

[2023] EWCA Civ 1416 · PRE-ACTION CONDUCT & MEDIATION

What happened: A homeowner brought a claim concerning Japanese knotweed. The council argued that he should first use its complaints and dispute-resolution process.

What the court decided: The Court of Appeal confirmed that courts can pause a case or require a suitable attempt to resolve it outside court. The requirement must be proportionate and preserve the right to a court hearing. It did not order this claimant to complete that particular process on appeal.

The rule in plain English: A court can require steps towards settlement, such as mediation. Requiring participation does not force either side to accept a settlement.

Why it matters for trades: Read any mediation or settlement instructions carefully and take part where required. Prepare the facts, figures and possible terms. Do not assume that preferring a hearing gives you a right to ignore an ordered settlement process.

Read the court judgment or official case record

[2018] UKSC 12 · COURT RULES FOR PEOPLE WITHOUT LAWYERS

What happened: A claimant without a lawyer emailed court papers to the other side’s solicitor. The rules required permission for that method of formal service, and the solicitor had not agreed to it.

What the court decided: The Supreme Court refused to treat that attempt as valid service on the facts of the case.

The rule in plain English: Serving means formally giving documents to the other side using an allowed method. It is different from filing, which means giving them to the court. Simply having someone’s email address does not always make email service valid.

Why it matters for trades: Check the method and deadline stated in your court papers and the applicable rules. Use the required online, email or paper route. Representing yourself does not remove these requirements, even if the other side already knows about the dispute.

Read the court judgment or official case record

These summaries explain selected points from real judgments. They are general information, not advice on an individual dispute. Read the full decision and check relevant laws and later cases before relying on it. The facts and wording of your own agreement can change the answer.

Agency & Authority · Contractors & Subcontractors